Name Fabryka Osłonek Białkowych Fabios S.A

Location Białka

Implementation date 2016

Scope of work

Implementation of a ventilation system to improve the efficiency of collagen foil drying air preparation under the GEKON I program and to improve the efficiency of line no. 10 under program I

The project aimed at developing drying air distribution ducts for open and closed drying tracks. The ducts were made of laminated panels with a polyurethane core with a thickness of 10 cm and located directly above the tracks at a height of at least 2.5 m so as to provide the required air flow of Vn = 90,000 m3/h for each drying track. The work was carried out without closing the facility.